Completed Projects

Home Completed Projects

IMPROVEMENTS, UP-GRADATION AND DPR PREPARATION:

1 FS cum DPR, Survey and Preparation of Land Plan by adopting LiDAR or equivalent technology for Widening to Two Lanes with Paved Shoulders from “Gundlupet (NH 212) to Chamarajanagar (NH 150A) in the State of Karnataka for an approximate length of 35 Kms (from Km 0.00 to Km 35.00) (Job No: NH-KNT-2017-18-881) for NH Division, Bengaluru
2 FS cum DPR,, Survey and preparation of Land Plan for Up gradation of State Road to National Highway by Adopting LiDAR or equivalent technology for the road “Junction of NH-48 near Sankeshwar connecting Gokak, Yaragatti, Munavalli and terminating at its junction with NH-52 near Naragund for NH Division, Hubli
3 Preparation of DPR for SHDP Phase 4 Stage I works in Kalburgi and Mysore Districts for PIU, SHDP, Bengaluru
4 2-Lane with or without paved shoulders of Roads connecting District Head Quarters to Taluk Head Quarters under the Jurisdiction of PWP & IWT Department (North Zone), Karnataka, for PWP & IWT Department, Bagalkot Division, Bagalkot
5 Widening to 2-Lane (Road connecting District to Taluk) of  SH – 117, SH – 21, SH – 81, SH – 86, B.H.A. Road, Hunsur – K.R. Nagara Road, Mandya – Nagamangala Road, Mandya – Bannur Road, M.G.M. Road to a Total Length Of 221.20 KM  in Mysore, Mandya and ChamarajaNagara Districts for PWP & IWT Department, Mysore Division, Mysore
6 Widening to 4 Lane (Road connecting District to District) in Selected Reaches of SH – 57and SH-47 for a Total Length of 98.76 KM in Mysore, Mandya and ChamarajaNagara Districts for PWP & IWT Department, Mysore Division, Mysore.
7 DPR for DPR for Ring Road around Pune City, Pune Metropolitan Region Development Authority, (PMRDA) Pune
8 Feasibility Study, Detailed Project Report Survey and Preparation of Land Plan for Widening to Two Lane with Paved Shoulders from KM 125.626 to 182.126 of NH 167 Hagari to AP Border Section in the State of Karnataka for NH Division, Chitradurga
9 DPR for Widening to 4 lane  in selected reaches of SH-2, SH-25, SH-48, SH-62, SH-76 and SH-153 for a total length of 208.30 KM & Widening to 2 lane of SH-1, SH-24, SH-26, SH-48, SH-65, SH-150, Davanagere- Malebennur, Chitradurga to Molkalmuru and Chitradurga to Hosadurga MDR for a total length of 238.79 KM in  Shimoga, Davanagere and Chitradurga District for PWP & IWT Department, Shivamogga Division, Shivamogga
10 DPR for 4 Laning / 2 Laning with or without paved shoulders of Roads connecting One District Head Quarters to Another District Head Quarters, District Head Quarters to Taluka Head Quarters for PWP & IWT Department, Bidar Division, Bidar
11 DPR for 4 Laning / 2 Laning with or without Paved Shoulders of Roads connecting One District Head Quarters to Another District Head Quarters and District to Taluka Head Quarters for PWP & IWT Department, Haveri Division, Haveri
12 Project Management Phase I including Preparation of DPR for Upgradation of Badakera (Angul) – Hindol – Ganja – Daspallah – Bhanjanagar Road (approved “In Principle” for declaration as National Highways) in the State of Orissa to Two / Four Lane with Paved Shoulder Configuration (Lot V) – (NH / IAHE / 40 for Executive Engineer, NH Division, Dhenkanal, Odisha
13 DPR of selected Stretches / Corridors of Road Networks in the State of Maharashtra for Upgradation to Two Lanes with Paved Shoulder / Four Lane Configurations of (Package 2 – Dhondaicha – Kusumba – Dongrale – Malegaon Road – 96 Kms) + Malegaon Bypass for NH Division, Nashik
14 BMICP Phase II Feasibility Studies DPR, Construction Supervision and Quality Control (White Topping Total length 20 Km 4 Lane) for Nandi Infrastructure Corridor Enterprise Limited
15 FS cum DPR, Survey and Preparation of Land Plan for Widening to Two Lane with Paved Shoulders from Km 483.591 to 509.50 of NH 234 Chinthamani to Andhra Pradesh Border Section in the State of Karnataka for NH Division, Tumkuru
16 White Topping in Outer Ring Road connecting Mysore Road to Tumkuru Road via Sumanahalli Junction for Bruhat Bangalore Mahanagara Palike
17 Feasibility Study, Survey and Preparation of Detailed Project Report for Upgradation of existing Two Lane with Paved Shoulder to Six Lane configuration along with Service Road from Ch: 403+800 to Ch: 434+000 Km of Bangalore – Pune Section for a length of 30.20 Kms (Bypass connecting Twin Cities – Hubli – Dharwad). The Project was awarded to Nandi Highway Developers Ltd on BOT basis by Government of India for Nandi Highway Developers Limited
18 Preparation of Design Report for the works in BBMP Road Infrastructure – East Division –
33 Roads and 22 Roads for Bruhat Bangalore Mahanagara Palike
19 State Highway (SH 35) between Sidlaghatta with Anekal – 35.00 Km in Bangalore (Rural) District for Karnataka Road Development Corporation Ltd (KRDCL)
20 State Highway (SH 129) between Chikkahosur – Mudagal – Mundargi Road (32 Km) in Koppal District for KRDCL.
21 State Highway (SH 65) between Malpe with Molkalmur – 52 Km in Davanagere District for KRDCL
22 Yadavada to Lokapura (SH 44) i.e., 22.50 Km on Sankeshwara – Sangama Road in Belgaum & Bagalkot Districts for KRDCL
23 Wanmarpalli – Raichur Road (sh 15) – 43 Km and Srirangapattana – Jewargi Road (sh 19) – 13 Kms in total 6 Nos rehabilitation of Bridges, 6 Nos. Minor Bridges, 111 Nos. Pipe Culverts, 18 Nos Box Culverts in Yadgir Dist for KRDCL
24 Strengthening & Rehabilitation works of High / Medium Density Corridor roads in Bangalore city under World Bank Loan assistance KMRP Package 2 and 4 (35 Kms), Arterial and Subarterial Roads for Bruhat Bangalore Mahanagara Palike
25 Roads connecting Historical places like Badami, Banashankari, Pattadkallu and Hungund at Sh 57, SH 135, SH 14 in Bagalkot District for KRDCL 54.80 Kms (2 Nos Major Bridges, 6 Nos Minor Bridges, 63 Nos. CD Structures)
26 SH 10 – Upgradation from Maharashtra Border to Andhra Pradesh Border via Aland, Gulbarga, Malkhed, Sedam Ribbanapally (Whagdhari – Ribbanapally Rd) in Gulbarga Dist for KRDCL – 135 Kms
27 Consultancy Services for 6 laning of SH 10 from Gulbarga Ring Road to proposed Airport for a length of 14.5 Kms at Gulbarga for KRDCL
28 BMICP Phase I Feasibility Studies, DPR, Construction Supervision and Quality Control (total length 41 Kms,
4 Lane), 1 ROB, 1 Major Bridge, 3 Minor Bridges, 14 Underpasses, 23 Overpasses & 90 Culverts with
6 Interchanges & one Cloverleaf Interchange for Nandi Infrastructure Corridor Enterprise Limited
29 BMICP Phase II Feasibility Studies DPR, Construction Supervision and Quality Control (White Topping Total length 20 Km 4 Lane) for Nandi Infrastructure Corridor Enterprise Limited
30 Mandya Shravanabelagola Road in Mandya District – 73 Km (Minor Bridges – 13 Nos, CD Structures – 154 Nos) 2 lane configuration for KRDCL
31 Mysore Bantwal SH 88 upgradation Package A and B.
32 Extension of Four Laning of Kotekar – Puthuru Road (MDR) from Km 15+100 to 15+390 to in front of Infosys – Mangalore SEZ Campus for Infosys Foundation
33 Pre-Tender Activities for Pune – Solapur road construction of 4 lane access controlled Expressway with service road, 1 ROB, 1 Flyover, 4 Major Bridges, 12 Vehicular Underpasses, 37 Minor Bridges and 203 Culverts for Kalyani Global Engineering Pvt. Ltd
34 Consultancy Services for preparation of Engineering Report for KHED Economic Infrastructure SEZ Development Phase (1A) Priority – 1 (Approx 1000 Acres) for KHED Economic Infrastructure Pvt. Ltd
36 DPR for Road Parallel to NH 16 in ZDP and fixing the Best Alignment between Vijayawada IRR and Kesarpalli NH Junction for IIC Technologies, Hyderabad
37 Consultancy Services to Design for developing Urban Road Infrastructure in Tirunelveli Town in Tamilnadu.  Bridge: 1 No, Minor Bridges – 27 Nos, CD Structures – 1022 Nos, Pedestrian Subway – 8 Nos, Bus Shelters – 94 Nos., Multi Storeyed Parking 5 Nos in association with Meinhardt Consulting Engineers for Tamilnadu Urban Road Infrastructure Fund.
38 Re-aligning the Western Ring Road 4 Lane configuration with 49 CD works to Coimbatore city for a length of 35 Km (2 Nos Major Bridges, 21 Nos Minor Bridges, 20 Nos Box Culverts and 5 Nos. Pipe Culverts)
39 DPR for Bypass road including Minor bridge work, junction improvements and CD works etc., for forming bypass road to Tiruchengode Town in Km 0/0 – 13 / 615 and preparing of Land Plan Schedule for Land Acquisition
40 Gidhori – Sarangarh section of State Highway 13 in the State of Chhattisgarh for a total length of road 54 Km, 3 Major Brides, 10 Minor Bridges and 84 Culverts to 2 lane configuration for Chhattisgarh Highways Development Co. Ltd
41 Mahasamund Bypass length of road 12 Kms – Chhattisgarh Highways Development Co. Ltd (1 No. Major Bridge, 3 Nos. Minor Bridges and 11 Nos. Culverts)
42 Pre-tender studies and consultancy related to Development of Eastern Peripheral road project for Delhi with 6 ROBs, 7 Interchanges, 8 Major Bridges including 600m and 300m bridges across river Yamuna and 240m across river Hindon along with various access control structures, minor bridges and culverts for Jaiprakash Associates (136 Km 4 laning configuration).
43 Pre-tender consultancy services for “Design and Construction of Civil, Structures and Track works of Bhoupur Kurja Section of DFCC for Contract Package 101, 102 & 103 (Eastern Corridor 330 Kms Length) for Railways ESSAR Projects

PROJECT MANAGEMENT CONSULTANCY SERVICES – ROADS

1 DPR & PMC – Preparation of City Roads including BoQ, Estimated Cost, Tender assistance,
Pre-Services including Quality & Quantity Certification for Nagarothana Phase-III project for Urban Local bodies in the Bagalkote District of Karnataka State
2 DPR & PMC – Preparation of City Roads including BoQ, Estimation, Tender assistance, Pre-Services including Quality & Quantity certification for Nagarothana Programme Phase II for Urban Local bodies in the Districts of Tumkur, Haveri, Bagalkote and Belgaum Districts for Directorate of Municipal Administration, Govt. of Karnataka (approx. 808 Km, single lane + 2 Lane)
3 Balance Works of 4 Laning (Central BRT Corridor) of Mangsuli – Lakshmeshwar (SH-73) between Km 229+00 to Km 248+40 old NH 4 between Hubballi & Dharwad (selected reaches) from Hosur at Hubballi to Jubilee Circle to Dharwad
4 Construction of 4 Lane Road Works of Kotekar – Pathuru Road (MDR) from Km 14.35 to 15.210 in front of Infosys Mangalore SEZ Campus for Infosys Foundation
5 Construction of Road from Gate No. 3 to Gate No. 5 at Infosys Mangalore SEZ Campus for Infosys Limited
6 Interchange Ramps of Tarihal Interchange and Junction Improvement Works at Hubli – Dharwad Bypass
7 Wanmarpalli Raichur Road (SH 15) / (SH 19) – 40 Km in Yadgir Dist for KRDCL
8 Improvement & Upgradation to 4 & 6 lane configuration including drains, foot paths and CD Structures for City Roads in Kalaburagi City for KRDCL
9 Improvements & Upgradation to 6 lane configuration including drains, foot paths and CD Structures for City Roads in Kalaburagi City – 8.375 Kms for City Corporation, Kalaburagi
10 Improvements & Upgradation to Bilikere – Belur Road (SH 57) for 42 Km including curve improvements & bypass to Holenarsipura town for 3 Kms for KRDCL
11 Road Improvement works on Jewargi – Bijapur road SH 12 for 30 Kms for KRDCL
12 Construction Management & Supervision of Internal Roads (20 Kms) at Infosys Campus, Mysore and Mangalore

DETAILED PROJECT REPORTS – BRIDGES / FLYOVERS AND GRADE SEPARATORS

1 Construction of Bridge across Lakshmanatheertha River near Kirijaji Village – Kattemalalavadi – K.R. Nagara Road in HunsurTaluk, Mysore District – 2 Lane for KRDCL
2 Construction of Bridge to Sangapura Village near Sri GavisiddalingeswaraSwamy Temple to Degganahalli Village K R Nagara Taluk connecting in KRS Backwaters Road in K R Pet Taluk, MandyaDist – 2 Lane for KRDCL
3 Construction of Bridge across Kapila River near Goddanapura Village in Nanjangud Taluk, Mysore Dist. 2 Lane for KRDCL
4 Construction of Bridge across Kapila River near Bilagali Village in Nanjangud Taluk, Mysore Dist. 2 Lane for KRDCL
5 Construction of Bridge across Cauvery River in the vicinity of Holesalu near Kaveripura village in T Narsipura Taluk 2
6 Pre-feasibility study report (preliminary study / investigations / designs & Costing) under QCBS for Construction of Bridges on Turnkey basis in Five Packages at Identified Locations in the State of Karnataka” – Package V for KRDCL
7 Construction of Four Lane Major Bridge (including Approach Roads) across Krishna River @ Km 180+865 of NH 167 – Hagari to AP Border Section in the State of Karnataka on EPC Mode for NH PWP & IWT Department, Chitradurga
8 Construction of Major Bridge Construction of Major Bridge near Talabal and Nitali at
Km 4.90 and Km 6.50 respectively on NH 367 in the State of Karnataka for NH Division, Hubli
9 Construction of Major Bridge across Sharavathi Back water between Ambargola – Kalasavalli and Improvements to Approach Road upto Singandureshwari Temple in Sagar Taluk, Shimoga for PW,P & IWTD, National Highways, National Highway Division, Chitradurga (Extradosed bridge – 2125m)
10 Construction of Bridge across Bheema river in Jewargi Taluk, Kalaburagi District (length of bridge 420m) 2 lane configuration for KRDCL
11 Construction of Bridge across Bennethorahalla in Chittapura Taluk, Kalaburagi District (length of Bridge – 175m) 2 lane configuration for KRDCL
12 Construction of Bridge in the backwaters of Sharavathi near Bekkodi in Hosanagar Taluk, Shivamogga District (length of bridge – 680m Major Bridge) 2 lane configuration for KRDCL
13 Construction of Bridge across Lokapavani (2 span of 26m – 52m, PSC Y Girder, 1 span 13m RCC I Girder with CSI deck slab) and Paschimavahini river (2 span 20.6 – RCC Y Girder with CSI deck slab) on Bangalore – Mysore
(SH 17) in Mandya District – 2 lane configurations for KRDCL
14 Construction of Bridge across Thungabhadra River between Kadebagilu – Bukkasagara in Gangavathi taluk, Koppal District (length of bridge – 487.5m Major Bridge) 2 lane configuration for KRDCL
15 Construction of Bridge across Garudachala river at 7.5 Km in Korategere Taluk, Tumkur District (length of bridge 2 x 25m and 2 Nos of 3 x 3 box cell) 2 lane configuration for KRDCL
16 Construction of Bridge across Krishna River between Chandurtech & Sainiktech in Belagavi Dist.  Across Shimsha River near Vaidyanathapura in Mandya Dist (length of bridge – Krishna – 10 x 25m = 250m RCC I Girder and deck slab) (Shimsha Bridge – 9 x 25 + 1 x 15 = 240m PSC Y Girder of deck slab) 2 lane configuration for KRDCL
17 Grade Separator intersection at TTMC near Kengeri at Km 15.60 of Bangalore – Mysore road (SH 17) 2 lane configuration for KRDCL
18 Construction of Bridge across Krishna River at Hipparagi Village (length of the bridge – 400m Major Bridge) 2 lane configuration of Karnataka Neeravari Nigama Ltd
19 Construction of Flyover along ORR at Veerannapalya Junction length of viaduct 195m
(2 Nos) on LHS & RHS Span arrangement 8×20 + 1x35m Carriageway width 12m (3 lane) service road 750m for Bangalore Development Authority
20 Construction of Flyover along ORR at HSR 14th main junction length of viaduct 245m (2 Nos) on LHS & RHS Span arrangement 05×20 + 1×32 + 1×33 + 4×20, carriageway width 12m (3 lane) service road 650m Deverabeesanahalli 04×20+1×35+4×20 – 195m & Bellandur 04×20+1×35+4×20 – 195m for Bangalore Development Authority
21 Construction of Flyover along ORR at Kalyannagar junction length of viaduct 300m on LHS & RHS, span arrangement 13×20+1x40m, carriageway width 12m (3 lane), Hennur 4×20+1×53+4×20 extended 4×20+1×35+7×20+1×30+4×20 for Bangalore Development Authority
22 Bridge at 4,32 and 4.72 Km across Ghataprabha River in Belagavi District (length of the bridge – 120m at 240m) 2 lane configuration for KRDCL
23 Construction of High Level Bridge across Krishna River at 7.40 Km of Jamkhandi in Bagalkot District (length of the bridge – 600m Major Bridge) 2 lane configuration for KRDCL
24 Construction of Bridge at Ch: 153 (1×33.5+8×35.5+1×15.8 = 368.8 PSC Y Girder with CSI deck slab) across Thungabhadra river in Honnali Taluk in Davanagere District and at Ch: 278+300 (2×20+6×42=292m PSC Y Girder with CSI deck slab) near Harihara in Harihara taluk 2 lane configuration for KRDCL
25 Construction of Bridge across Cauvery River (Sosle) near T Narsipura at 2.30 Km in T Narsipura Taluk, Mysore Dist (length of the Bridge – 434m) 2 lane configuration for KRDCL
26 Construction / reconstruction of Phase III Bridges in Package III in Bangalore, Shivamogga, Davanagere and Chitradurga Districts and Phase II in Haveri, Gadag Districts, Phase III total length of bridge structures 1405m, No. of major bridges – 4 Nos, No. of minor bridges and culverts – 22 Nos for Nagarjuna Construction Co. Ltd
27 Construction / reconstruction of 71 Bridges in Package III in Bangalore, Tumakuru, Kolar, Shivamogga, Davanagere District, total length of bridge structures 1703m, No. of major bridges – 2 Nos, No. of minor bridges & culverts – 78 Nos for Nagarjuna Construction Co. Ltd
28 Construction of bridge across Thungabhadra river at 1432m to 1919.5m Kadebagilu & Bukkasagara in Gangavathi Taluk, Koppal District, span configuration 15x32m with superstructure comprising of PSC high grade with CIS deck slab
29 Construction of Flyover from NH 4 to Central Bus Terminus via Ashoka Circle with approaches in Belagavi City for Belagavi Smart City Limited
30 Construction of Grade Separator in Km 9/4 – 10/6, Km 8/2 – 9/0 of Avinashi – Tirupur – Palladam – Pollachi – Cochin (via) Meenakarai road (SH 19) and forming Link Road to the Bridge constructed across Noyyal connecting Km 2/2 of Tiruppur – Kangeyam road and Km 3/2 of Tiruppur – Vijayamangalam road (Package No. 1)  2 / 4 Lane for Divisional Engineer, (Highways), C & M, Tiruppur Division
31 Construction of Flyover in Km 633/310 – 636 / 620 in Kottara – Chettikulam of NH 47 including approaches under Tirunelveli NH Circle, Tamilnadu for Divisional Engineer, NH Division, Nagercoil
32 Construction of Extension of Flyover along Athupalam & Ukkadam Junction upto Oppnakara Street in Coimbatore
33 Construction of Flyover along Dindigul Bangalore road (NH 209), Pollachi Palghat road
(SH 78A), Municipal bus route road (ODR) and New scheme road (Pollachi Municipal road) in Pollachi town.  Length of flyover 1670m in 1st level and 860m in 2nd level
34 Construction of Flyover in Gandhipuram area in Gandhipuram 1st level 16.6m deck width, span arrangement 42×25+29.5×8+52m x 1 No & 45mx3 Nos = 1750m, 2nd level 8.5m deck width, span arrangement – 37×25 + Obligatory spans – 1 x45=980m, Ramp length level 1 – 280m and Ramp length level 2 – 250m four / 2 lane configuration
35 Construction of flyover along Athupalam & Ukkadam junction upto Oppanakara Street in Coimbatore – 1st level 16.6m deck width, span arrangement – 40×25 post tensioned Y Girder and 36.5×5 Nos + 52×1 – 1234.50m, 2nd level 10m deck width, span arrangement – 15×25 post tensioned Y Girder & 50x 3 Nos + 27.5 x 1 No + 33.625 x 1 No – 739m 5, 6.5m span arrangement – 03 x 25, 6) Ramp length level 1 495m & 7) Ramp length level 2 260m – Four / 2 lane configuration, construction of grade separator – Tiruppur (PKG 1)
36 Construction of ROB / RUB in lieu of LC C – 168 (RTO Phatak) long with its drainage disposal at Jodhpur (Rajasthan) for Jodhpur Development Authority
37 Construction of two (2) Lane ROB (Railway portion and approaches) at LC No. 1 on Ajmer – Daurai Section including Detailed Engineering Survey, Geotechnical Investigation, Design as per GAD approved by Railway authorities, Structural Design, preparation of working drawings for Rajasthan State Road Development & Construction Corporation Limited
38 Construction of two (02) Lane ROB (Railway portion and Approaches) at LC No. 02 on Ajmer – Daurai Section including Detailed Engineering Survey, Geotechnical Investigation, Design as per GAD approved by Railway Authority Structural Design, preparation of working drawings for Rajasthan State Road Development & Construction Corporation Ltd
39 Preparation of General Arrangement Drawing (GAD) for 4 lane Rob in lieu of RUB B 72 (between Riktiabhairuji Chauraya & Rotary circle) at Jodhpur including proof checking of design – First level 16.6m deck width, span 23×25 + 1×24.4m, Obligatory span – 2×55 + 1×37, Obligatory Spans ROB1x38 and Ramp length 450m,2) & second level 8.5m deck width, span arrangement – 12×25 + 1×21.9, Obligatory spans NH crossing 1×45. Ramp length 200m
4 lane configuration

PROJECT MANAGEMENT CONSULTANCY SERVICES – BRIDGES & BUILDINGS

1 Construction of Bridge to Sangapura Village near Sri GavisiddalingeshwaraSwamy Temple to Deganahalli road in K R Nagar Taluk  in KRS Backwaters Road in K R Pete Taluk” and “Construction of Bridge across LakshmanaTheertha River along Kirajaji – Kattemalavadi – K R Nagara Road in HunsurTaluk, Mysore Dist for KRDCL
2 Construction of Bridge across Cauvery River in the vicinity of Holesalu near Kaveripura Village in
T NarsipuraTaluk, Mysore Dist for KRDCL
3 Construction of Bridge across Bheema River in the middle of the Hipparagi – Kona – Saradagi (B) Road in Jewargi Taluk, Kalburgi District” for KRDCL
4 Construction of Road Over Bridges (ROBs) on Mixed Traffic Lanes at Ch: 13+480 (Km 234+510) on either side of the existing ROB on Mangsuli – Lakshmeshwar (SH 73) road between Hubballi – Dharwad under BRTS Project
5 Construction of Bridge across Shimsha river near Vaidyanathapura in Maddur taluk, Mandya District for KRDCL
6 Flyover along ORR Bhadrappa Layout junction, Bangalore (span configuration 4×20 + 1 x35 – 115m, 3 lane with PSC I Girder, PSC box girder for obligatory & CSI deck slab
7 Construction of bridge across Krishna River at Km 7.40 of Jamkhandi Savalgi road near Jambagi village in Jamkhandi Taluk, Bagalkote District
8 Construction of bridge across Malaprabha river at Km 48.20 near Munavalli on Arabhavi Challikeri Road in Saudatti taluk in Belagavi District AND Construction of bridges at Km 4.32 and Km 4.72 across Ghataprabha river on Ghataprabha Railway station to Konnur village in Gokak taluk in Belagavi District
9 Construction Supervision of Exports Oriented Garment manufacturing unit in SEZ, Kakkanad, Cochin, Kerala, Area of construction 80,000 Sft
10 Construction Supervision of Mahindra World City at Jaipur, Area of construction 4.50 lakhs Sft.
11 Authority Engineer for Supervision and Construction of 4 Lane / 2 Lane Major / Minor Bridges and 2 Lane RoB’s in the Stretch from Km 161 / 600 (Kashedi) to 450 / 00 (Zarap) Section of NH 66 (Erstwhile 17) in the State of Maharashtra under NHDI – IV on EPC mode for Govt. of India (MORT&H) by Govt. of Maharashtra, PWD
12 Authority Engineer Services for Supervision of Construction of 4 lane / 2 lane major & minor bridges and 2 lane ROB’s in the stretch from Km 161.00 (Kashedi) to 250.00 Km (Tural) (Package I); from Km 251.00 (Golavalil) to Km 352.00 (Rajapur) (Package II), from Km 353.00 (Unhale) (Package III) of NH 66 in the State of Maharashtra under NHDP IV for Govt. of Maharashtra, PWD, Maharashtra
13 Proposed Development works including development of Kakaramanahalli, Borehalli Village STP (SBR TEN Mid Teritary), Laboratory and office building at Sri Nethaji Subhash Chandra Bose Layout, Bidadi, Ramnagar Dist for Karnataka Housing Board
14 Project Management Consultancy Services (PMC) for proposed sites at Periyapatna, Anthrasanahalli, Madhugiri, Channapatna, Gundlupet, Maddur, Chamarajanagar, Bidadi, Shahapur, Bannur for Karnataka Housing Board
15 PMC for Housing Project at Anthrasanahalli, Bagalkote, Shahabad, Nanjangud, Ramasamudhra, Chamarajanagar District and M. Hosahalli (Yadgir), Gulbarga Dist & Shopping Complex project at Hootagally, Mysore Dist, Sites & Services Scheme at Borehalli Block I and Block III in Bidadi Ramanagar District for Karnataka Housing Board
16 Project Management Consultancy Services for the Construction of the Proposed First Grade College Building / Additional Classrooms / Laboratory / Library / Toilets / Other Infrastructure of Govt. First Grade Colleges in 1) Bilagi, 2) Jamakhandi, 3) Savalagi, 4) Navanagar, Bagalkote, 5) Mudhol, 6) Hungund, 7) Lokapur, 8) Hunnur, 9) Rabakavi Banahatti under Package 3A: Bagalkote District for Karnataka Housing Board
17 Project Management Consultancy Services for the Construction of the Proposed First Grade College Building / Additional Classrooms / Laboratory / Library / Toilets / Other Infrastructure of Govt. First Grade Colleges at 1) Channagiri, 2) Nyamathi 3) 165-MCC B Block, Davanagere, 4) 166-Davanagere, 5) Honnali, 6) Harihara, 7) Harapanahalli, 8) Sante Bennur under Package 5B in Davanagere District for Karnataka Housing Board
18 Project Management Consultancy Services for the Construction of Sites and Services Scheme at Chikkolikere in Channagiri Taluk of Davanagere District for Karnataka Housing Board
19 Project Management Consultancy (PMC) Services for the Sites and Services including Sewerage Treatment Plant (STP) of Capacity 12 MLD at Sompura, Bangalore Urban District for Nandi Infrastructure Corridor Enterprise Ltd
20 PMC & QA for Affordable Housing Scheme at Sy. No. 95 of Kanmineke Village, Kengeri Hobli, Bangalore South Taluk (Phase III) for Bangalore Development Authority
21 Project Management Consultancy Services and Slum Upgradation for 21 Class 1 cities of Tumakuru, Bellari and Hosapete in Karnataka for Karnataka Slum Clearance Board.
22 Design & Detailing of Industrial building for Bhabha Atomic Research Centre for providing Consultancy Services for Technology deployment facility (TDF) at Ullarthi Kaval site near Challakere, Chitradurga District, Karnataka State (35000 SqM) of Multi Storeyed buildings for MECON Limited.
23 Design & Detailed Engineering for Construction of Manufacturing complex at SEZ Chennai, Area of project 96000 Sqm, cost of project Rs. 65 Crores (work taken up 15500 Sqm) for Velankani Technologies Limited
24 Proposed Software park for M/s Accenture at SAN Complex, Area of project 16,05,300 Sft for Velankani Technologies Limited
25 Construction of Assembly Test Manufacturing Process (ATMP) Facility Building for SEM India Hyderabad (3500 SqM) for Velankani Technologies Limited
26 Design of Library Building & Construction of Hospital building – Area of the Project – 5084 SqM for Adhiyamaan Medical College, Tamil Nadu.
27 Consultancy Services for the design of Medical College Building – Area of the Project – 56975 SqM for Adhiyamaan Medical College, Tamil Nadu.
28 Design & Preparation of fabrication for Turbine supporting & other auxiliary structures (3000 T) for 500 MW Fast Breeder Reactor facility at Kalpakkam, Tamilnadu for GAMMON India
29 Structural Consultancy Services for Construction of New Factory complex at Hoskote.  Total Area – 5844 SqM for SAN Engineering & Locomotive Co. Ltd
30 Pre-Consultancy Services for setting up a Cancer Hospital and Research Center at Bangalore for Shri Shankara Cancer Foundation.
31 Township & Commercial complex including 23 Stories, 2 Nos. Towers and 2 Basements at Mangalore.  Area of the Project – 192487 SqM for CNC, Mangalore.
32 Design services for Airport Vehicle parking south vehicle washing bay, vehicle maintenance building for Bangalore International Airport for Balajee Infotech & Construction Pvt. Ltd